• Čeština
  • English
  • Libeňský Bridge

    The employees of the Klokner Institute performed an assessment of the technical condition of the Libeňský Bridge in the end of 2015. Then as a continuation of the assessment of the Libeňský Bridge an assessment of the Inundation Bridge was worked out in 2016. The expert opinion has been made as a result of the assessment – available on the TSK Praha a.s. websites: http://www.tsk-praha.cz/wps/portal/root/media/Fotogalerie.